Three Little Birds-drafted business plans · Hybrid health scoring · Investor-ready

Dream it. Build it. Launch it.

A small-business operating system that takes you from rough idea to investor-grade plan, week-one budget, compliance tracker, and a living roadmap — without the spreadsheet hell.

No credit card · 7-day preview tier · Pick a plan when you're ready
14
Business plan sections
50/50
Hybrid health scoring
<60s
From wizard to first draft
7d
Free preview tier — no card
How it works

Three steps from your notes app to a real plan.

01

Five-step wizard

Name, offering, industry, target market, expected revenue. ~2 minutes.

02

drafts your plan

Pricing model, revenue projection, competitive grid, customer acquisition, infrastructure — all live in under 60s.

03

Iterate, execute, capitalize

Tighten sections, log actuals, generate the launch board, list to investors when your Health Score crosses 50.

First 60 seconds

From blank page to a live business plan in 60 seconds.

Sign up, answer six quick questions in the wizard, watch the draft your plan section by section, and land on a live Business Plan with KPIs, Market analysis, Competitors, and Customer acquisition — ready to edit or share.

  • No credit card — free preview tier starts instantly
  • 6-question wizard tailored to your industry and geography
  • drafts 14 plan sections in parallel with a live progress bar
  • First plan section renders before your coffee's cool
three-little-birds · get started
Step 1 of 4 · Sign up
Start free — no card needed
Your name
Alex Rivera
Work email
alex@birdshop.co
Free trial · No card · Cancel anytime
Step 2 of 4 · Wizard
2 of 6
What do you offer?
Products ✓
Physical or digital goods
Services
One-off or recurring
Both
Products + services
Marketplace
Match buyers ↔ sellers
Industry
Coffee & specialty beverages
Step 3 of 4 · Drafting
Your plan is generating…
Anchored to your industry, geography, and Year 1 target
✓Executive summary
✓Market analysis
·Competitive landscape
Customer acquisition
Infrastructure
3-year revenue projection
~45 seconds · powered by Three Little Birds
Step 4 of 4 · Live plan
● READY
Birdshop Coffee · Business plan
Coffee & specialty beverages · Portland, OR
Year 1 target
$240k
Age range
25–44
Gender
All
Geography
PDX
Executive summary
01Market analysis · TAM $2.4B
02Competitive landscape · 4 rivals
03Customer acquisition · 5 tactics
Sign up in under 30 seconds — no card
Signup · Wizard · draft · Live plan — in 60 seconds
One platform · two journeys

Whether you're starting up or scaling up.

Three Little Birds meets founders where they are — get a brand-new venture launch-ready, then keep operating it like a system that compounds.

New founders

Launch with a plan that holds up.

Turn a rough idea into an investor-grade business plan, a week-one budget, and a living launch roadmap — in an afternoon, not a quarter. The drafts every section; you refine, and a hybrid Health Score tells you exactly when you're ready to open the doors (or pitch).

  • Guided 5-step wizard → 14-section plan
  • Three-statement financials + revenue projections
  • Launch board with dependencies
  • Clone a curated Plan Template to skip the blank page
Experienced founders

Operate sharper, every month.

Already trading? Launching isn't the finish line. Pressure-test new or existing products with real unit economics, get prioritized optimization moves grounded in your numbers, and run continuous improvement cycles — so the business compounds instead of drifting.

  • Feasibility analyzer with go / caution / no-go verdicts
  • Business optimization moves, highest-impact first
  • Continuous process improvement with measured baselines
  • Plan-vs-actual performance dashboard + Three Little Birds monthly review
The feature film · 60 seconds

See it in motion.

A one-minute walk-through of the wizard, the Three Little Birds-drafted plan, the live roadmap, and the launch-readiness score — exactly what your first ten minutes inside Three Little Birds feel like.

Six pillars

Everything you need before you spend a dollar.

One tool that walks with you from "I have an idea" to "we're hiring our second engineer." No more cobbling together docs, sheets, checklists, and pitch decks.

Dream

Three Little Birds-drafted business plan

Refined description, market analysis with live-cited research, competitive landscape, pricing model with rationale, 3-year revenue projection, customer acquisition tactics, and infrastructure — drafted in under a minute from a five-step wizard.

Three Little Birds business plan page showing the executive summary, health score and sidebar of every section
Health

Hybrid Plan Health score

50% deterministic (runway, budget completeness, revenue realism, roadmap balance — 25 pts each) + 50% qualitative LLM. Industry benchmarks show how you stack up, and every leg links back to the exact section that moves it.

Signals

Six Health scores, one glance

Every founder sees the same 0–100 stack — Plan Health (hybrid Three Little Birds+data), Launch Health (Plan · Roadmap · Compliance), Business Health (Launch · Funding · Marketing), Operating Health (Revenue · Funding · Marketing · Launch, ongoing plans only), Financial Health (Runway · Capital · Net vs plan · Marketing) and Growth Health (Audience · Reach · Conversion · Pipeline). Each leg is a click-through pill wired to the feature that moves the number — the score is never a dead-end.

Three Little Birds Business Hub showing six Health scores with per-leg breakdowns — Launch, Business, Operating, Funding and Marketing tiles
Command Center

Business Hub — one screen you actually live in

The daily home base. A phase ribbon that walks Idea → Plan → Roadmap → Launch → Operate. A composite Business Health score that goes red the moment your live plan slips below 65%. And one deep-linked Move of the Week — the single act-on-this-next lever, chosen automatically from the weakest leg — so you never open the app wondering what to do first.

Three Little Birds Business Hub for Bean & Bloom Coffee — journey ribbon on Plan phase, Business Health 39% Fragile with per-leg breakdown, and a Move of the Week card highlighting the next lever
See it all

Strategic Plan · Hierarchical Overview

The moment your plan graduates from Launching → Operating, the Business Plan becomes a Strategic Plan — a live, draggable SVG chart of Business Drivers → Strategic Goals → Projects → Roadmap Tasks on one screen. A pinnable Mini-Map lets you scrub around big plans (both axes), overflow indicators warn when a goal has more projects than fit, and every node is a click-through into the source surface. Launching plans get the same treatment via the Pre-Launch Overview (Business Plan → Compliance → Health → Goals). Edges are health-coloured — green healthy, amber drifting, red red-line — so a slipping goal jumps off the screen. The default view (Overview vs. Traditional sections) is a Settings preference so power-users can lock in the map.

Close the loop

Attribution Loop — Goals · Projects · Deals · Campaigns

Every closed-won deal and every marketing campaign carries an origin_ref back to the Strategic Goal or Roadmap Task that sparked it. A 4-week revenue sparkline sits on every Goal card. Filter the CRM pipeline or the Campaign list by any Goal with one click. Prefill a new Deal or Campaign from a Goal so the origin link happens automatically. Result: for the first time, you can answer 'how much revenue did this Goal actually produce?' — without a spreadsheet, without manual tagging, without leaving the app.

Run experiments

Projects Board — drag-and-drop growth board (Advanced)

Advanced founders get a Projects board on every operating plan — a four-column board (Ideas · Running · Won · Lost) for the growth initiatives you run against your Strategic Goals. Drag a card across columns to update status (Won triggers confetti + auto-nudges the linked Goal's progress). Each project has its own mini-roadmap of tasks, health ring, owner and due dates. Start from scratch or pick a proven template from the built-in library.

Offer

Products & Services catalog

The living catalog of what your business sells — product / service, name, description, price, cost, launch status (Draft / Active) and hero image. Click a card to edit inline; toggle Draft to Active with one click and Standard+ automatically flows the revenue into your Goals and forecast. Each item ties back to a customer segment and a pricing scenario so your P&L is never disconnected from the offer.

Three Little Birds Products & Services catalog with cards showing image, price, cost, and active/draft toggles
Execute

Launch board with critical path

Drag-and-drop execution timeline that respects dependencies. Stale-section detection nudges you when a wizard input changes downstream sections. Toggle to the Gantt view to see the critical path and slip risk against your launch date.

Three Little Birds Gantt timeline with dependency arrows and a highlighted critical path across launch milestones
Get-it-done

Service Agents — in-app vendor assistants for every task

Standard+ pins a task-scoped Three Little Birds agent to every roadmap card, wired into a hand-vetted catalog of 23+ real providers — Stripe Atlas & ZenBusiness for incorporation, Mercury for banking, Gusto & Rippling for payroll, Shopify for storefronts, Canva & Looka for branding, Mailchimp & HubSpot for outreach, Calendly & Notion for ops. Two modes: Chat for grounded step-by-step guidance on that exact filing, and Quick which turns 3–5 answers into a ready-to-paste draft (EIN application, business-account checklist, payroll onboarding brief). Every thread persists per task so you can pick up tomorrow exactly where you left off.

Try a live demo
Track

Budget, burn-rate, runway

Inline planned-vs-actual on every line. Receipt scanning. Per-month check-ins, blended runway, and a Pricing Scenario Bar to compare tactical price moves side-by-side.

Three Little Birds Budget page with planned-vs-actual columns, receipt scanning and a blended runway strip
De-risk

Jurisdiction-aware compliance tracker

Every plan comes with a live compliance checklist scoped to your city, county, state and industry — permits, licenses, tax registrations, zoning, health-department items and renewal deadlines. Group by status (not-started / in-progress / done / N-A), export the whole list to CSV or bring due-dates into your calendar via .ics.

Three Little Birds compliance tracker listing jurisdiction-specific licenses and permits with due dates
Fund

Grants finder — federal, state, local & private

One click matches your industry, location and stage against four live sources: Grants.gov (federal, open opportunities), SAM.gov Assistance Listings (federal authoritative catalog), Perplexity web citations (state, local, city, county and private/foundation/corporate programs) and a Three Little Birds matcher that scores every hit against your business. Save the ones you like and generate a per-grant application draft in minutes.

Three Little Birds grants finder showing matches from Grants.gov, SAM.gov, Three Little Birds-suggested and web-cited private programs
Validate

Market research with live citations

One click pulls a web-sourced market report into your plan — TAM/SAM/SOM sizing, growth trends, competitor landscape and demand signals — with every figure backed by a real, clickable source. It rides along into your pitch deck (PDF + PowerPoint). Standard+.

Capitalize

Investor marketplace + per-section engagement

Founders flip a switch when they're ready. Investors browse a curated read-only directory. Founders see exactly which sections each investor is reading.

Sell

Native CRM + deal pipeline

Standard+ drops a full sales OS into your plan: contacts, companies, deals and a drag-and-drop deal pipeline (Lead → Qualified → Proposal → Negotiation → Won / Lost). Closed-won deals feed straight into your Goals and Runway, so your projection stays honest as the pipeline moves. Segment views break the pipeline down by customer type so you see exactly where your revenue is really coming from.

Three Little Birds CRM deal pipeline with Lead, Qualified, Proposal, Negotiation and Won columns full of real deals
Store

Document Library with research

A tag-and-folder document vault for contracts, invoices, licenses and receipts. Drop in a PDF or image and Three Little Birds extracts key terms, dates and amounts so you can search across every file — no more digging through email attachments when the accountant asks.

Borrow

Loan modeler + bank-ready package

Model any loan side-by-side against your budget: enter amount, term, APR and equity injection and we compute the monthly payment, DSCR, break-even and the runway impact — instantly. When you're ready, one click builds a lender package (3-statement financials, Sources & Uses, borrower forms, cover letter and industry benchmark page) as a single bank-formatted PDF, plus a full .docx of your plan, all e-mailable straight to the banker with a delivery history log.

Three Little Birds Loans page with amount, term, APR, equity injection and a bank-ready PDF export flow
Reconcile

QuickBooks & Xero sync

Standard+ connects QuickBooks Online or Xero in one click. We pull your last 30 days of transactions — read-only, never writing back — and merge them into your Budget Actuals per month. No accounting tool? A guided CSV import gets you the same result.

Finance

Lender-ready financial package

Standard+ turns your plan and budget into the documents a bank needs: a 3-statement model (P&L, cash flow, a balance sheet that balances), Sources & Uses, break-even and DSCR — plus blank borrower forms — exported as one bank-formatted PDF.

Reach

Marketing Journeys — email + SMS on autopilot

Advanced turns your contacts into orchestrated outreach. Build reusable Email & SMS templates with click-to-insert placeholders ({{first_name}}, {{business_name}} and four more), then chain them into multi-step Marketing Journeys — 5 node types (Email · SMS · Wait · Split · End) on a drag-and-drop canvas, triggered by manual enrolment, new-contact creation, entry into any of 8 built-in smart segments, or entry into a saved Contact Group. A live Cost Guard forecasts every send against your global monthly Send Budget AND your per-segment sub-caps — anything that would exceed either cap is blocked before it drains your quota. Each campaign tracks Delivered / Opened / Clicked with pixel-based open tracking and redirect-based click tracking. Real SMS + provider-delivered email out of the box, workspace-wide dashboard rolls up every plan.

Create

Social Media Ad Copy — drafts for Meta, Google, TikTok & LinkedIn

Generate platform-native social ad copy in seconds. Pick a product/service, tone and audience — Ad Copy Studio drafts 3 variants per platform (Meta, Google, TikTok, LinkedIn) with headlines, primary text, CTAs, hashtags and character-limit guards baked in so nothing overflows. Export as CSV with UTM tags auto-appended (utm_campaign=draft id, utm_content=variant idx) so every paid click routes straight into the CRM's attribution loop — no manual tagging, no spreadsheet stitching.

Prove ROI

Ads Tracking + CRM Attribution — close the loop from ad → deal → revenue

Paste your Meta Pixel and Google Ads conversion IDs once and Three Little Birds emits a copy-paste tracking snippet. Every closed-won deal can be attributed back to a specific Ad Copy Studio draft × variant — automatically via UTM parsing, manually via a draft picker, or in bulk via multi-select on the pipeline. See a Top-5 leaderboard, a 0–100 Attribution Health Score with a 12-week sparkline, and one-tap filter pills on the plan dashboard that drill straight into the deals a given ad produced. Meta Conversions API (server-side Purchase events) fires automatically when a deal flips to Won so your bidding optimises for real revenue, not just form fills — SHA-256-hashed PII, dedup via event_id, and a Replay button on the Attribution page to backfill historical wins. Every bulk action has a 24-hour Undo (72h on Advanced+) so a fat-finger is a one-click recovery.

Forecast

Driver forecasting + industry benchmarks

Advanced builds a bottom-up 3-year monthly P&L from real drivers — revenue streams, hires, operating expenses synced one-click from your Budget — exportable as a 36-month CSV, with layered what-if scenarios on top. Standard+ also compares your margins, labor, rent and growth against vetted industry ranges, flags assumptions that look off, and deep-links you straight to the line that needs fixing.

Three Little Birds Driver Forecast chart showing a 36-month revenue projection with contribution and gross-margin overlays
Start fast

Business Plan Examples library

Don't start from a blank page. Browse 50 complete, polished example plans across industries — cafe, retail, SaaS, services, trades, manufacturing and more — preview the full strategy, financials and roadmap, then clone one into your workspace and make it yours in a single click.

See real example plans
Operate

Product & service feasibility

Launching isn't the finish line. Standard+ lets you pressure-test any new or existing product or service — we compute the unit economics (contribution margin, monthly contribution, break-even) and hand you a grounded go / caution / no-go verdict with the highest-leverage moves to make next. Validate before you build, and optimize what you already run.

Operate

Business optimization

Stop guessing where the leverage is. We read your plan, your actuals and your industry benchmarks and hand back a prioritized list of the highest-impact cost, pricing and margin moves — each with the expected effect, so you act on the few things that matter most.

Operate

Continuous process improvement

Run your business like a system that compounds. Log the processes that matter, run improvement cycles (plan → change → measure) and track the real impact against a baseline over time — so every month you operate a little sharper than the last.

three-little-birds · Journeys
Marketing → Journeys
Every touchpoint, in one canvas
Start blank, or from 1 of 3 ready-to-launch templates
Blank canvas
Start from scratch
Welcome new customers
3-touch onboarding
Re-engage sleeping
Dormant nudge + split
Post-purchase
Thanks → wait → review ask
Journey · New-lead nurture
● LIVE
TRIGGERSegment: New leadsWAIT2 daysEMAILWelcome — {{first_name}}SPLITopened?EMAILBook a callSMSNudge — 24hENDENDSTATSSent 128 · Opened 71 · Clicked 22 · SMS 41 · Ended 128
Cost Guard · monthly forecast
Every send checked against your budget
Global monthly send budget1,240 / 2,000
VIP segment sub-cap180 / 300
Cold segment sub-cap740 / 1,000
Blocked“Cold-list drip” would push you 12 sends over — edit or wait til next month
Start blank or from 3 ready-to-launch templates
Journeys · Cost Guard · Segments · Advanced
Marketing Journeys

One canvas. Every touchpoint. Zero spreadsheets.

Chain email, SMS and wait steps into a live Marketing Journey that fires when a new contact lands in a smart segment — then let a real-time Cost Guard forecast every send against your monthly budget and per-segment sub-caps before a single message goes out.

  • 5 node types (Email · SMS · Wait · Split · End) on a drag-and-drop canvas
  • Triggered by manual enrolment, new-contact creation, smart segments, or Contact Groups
  • Placeholders like {{first_name}} + {{business_name}} — click-to-insert, no memorising
  • Real SMS + provider-delivered email · pixel opens · redirect click tracking
  • Cost Guard blocks any send that would blow your monthly Send Budget
The attribution loop

From ad draft to won revenue — in one product.

Draft platform-native ads in seconds, ship them with UTMs baked in, and watch every closed-won deal trace itself back to the exact creative that produced it. Founders on Advanced get a live Top-5 leaderboard, a 0–100 Attribution Health Score, filter pills for one-tap drill-through, and a 24–72 hour Undo on every bulk action.

  • 3 platform-native variants per platform (Meta, Google, TikTok, LinkedIn)
  • UTM auto-appending + CRM deal attribution (auto · manual · bulk)
  • Meta Conversions API server-side Purchase events
  • Attribution Health Score + 12-week sparkline trend
  • 24h Undo (72h on Advanced) — admin-tunable per tier
three-little-birds · CRM
Ad Copy Studio
3 platform-native variants, one click
META
Turn spare rooms into steady rent
Three Little Birds helps you list smarter.
GOOGLE
List Your Room In Minutes
Free Three Little Birds setup · Cancel anytime
TIKTOK
POV: your room is now $$$
Try Three Little Birds listing tool →
✓ Exported with UTMs — every click routes to your CRM
Top ads by revenue
Which creative is printing money?
● Health 78/100
1METATurn spare rooms…
$12,400
2GOOGLEList Your Room In…
$8,150
3LINKEDINRent smarter with Three Little Birds
$4,500
4TIKTOKPOV: your room…
$2,900
5METAWeekend income tips
$1,200
Filter pipeline by ad
METATurn spare rooms…
GOOGLEList Your Room In…
LINKEDINRent smarter
▸ Showing 7 deals attributed to META · Turn spare…
Lead
Sample deal #1
META · v0
Sample deal #2
META · v1
Sample deal #3
META · v2
Proposal
Sample deal #1
META · v0
Sample deal #2
META · v1
Won
Sample deal #1
META · v0
Bulk attribute mode · 12 selected
☑
Deal 1
☑
Deal 2
☑
Deal 3
☑
Deal 4
☑
Deal 5
☑
Deal 6
☑
Deal 7
☑
Deal 8
☑
Deal 9
☑
Deal 10
☑
Deal 11
☑
Deal 12
✓
Attributed 12 deals to META v0
Snapshot saved · one-tap undo
Ad Copy Studio drafts variants
Ad Copy Studio → Attribution → Bulk Undo · Advanced
Founders are shipping

Built with founders. Used by founders.

“I went from scribbled notes in Notion to a 14-section plan and a real budget in an afternoon. The hybrid health score finally told me what was actually weak.”
Maya R.
Founder, boutique consultancy
“The compliance tracker alone saved me a $400 lawyer call. Add the grants finder and the budget burn-rate panel and it's already paid for itself ten times over.”
Devon S.
Founder, food-truck startup
“Listing on the investor marketplace and seeing per-section engagement counts is genuinely a new experience for me as a founder. I know what they care about.”
Priya N.
Founder, B2B SaaS
Investor Marketplace

The only plan tool that closes the loop with your investors.

Standard+ founders flip a switch and their plan goes live for investors who match their industry. Per-section view counters tell you exactly which parts of the plan are pulling investor attention this week.

Marketplace · This week
Investors are clicking Burn rate 3× more than Compliance this week.
Pricing

Three tiers. Try the full experience free for seven days first.

Every new account starts on a 7-day preview tier — no card required. Generate a plan, explore every section, then choose the tier that fits when the preview ends.

Basic
$15
/mo

Plan + roadmap + watermarked PDF. Solo founders piloting an idea.

  • Three Little Birds plan draft
  • Launch board
  • Watermarked PDF export
Start with Basic
Most popular
Standard
$25
/mo

Everything in Basic plus budget tracking, compliance, CRM, documents, lender package, benchmarks, and the investor marketplace.

  • Budget & burn-rate
  • QuickBooks & Xero sync
  • Compliance tracker
  • Native CRM & pipeline
  • Document Library
  • Lender-ready financial package
  • Industry benchmarks + snapshot PDF
  • Investor marketplace listing
  • Clean PDF + customizable Pitch Deck
Start with Standard
Advanced
$35
/mo

Everything in Standard plus driver-based forecasting, what-if scenarios, investor scenarios, and Email & SMS campaigns.

  • Driver-based forecasting (36-mo CSV)
  • What-if scenario planner
  • Investor scenarios (equity / income / hybrid)
  • Email & SMS campaigns
  • Unlimited business plans
  • Priority support
Start with Advanced
For advisors & agencies

White-label the platform for your clients.

Pay one seat fee, invite your founders, and they get the platform branded with your logo + colors — at no extra cost to them. Their PDFs, share cards and invite landing pages all carry your brand.

Advisor Starter
$149
/mo

White-label the whole platform for up to 10 client founders.

Client seats
10
Your own plans
5
  • Your logo + colors on client PDFs, decks & share cards
  • Co-branded client login & invite landing pages
  • Cohort dashboard with per-client health scores
  • Email-invite onboarding (auto-copy link, 14-day expiry)
  • Full Standard features on every client seat
  • 10 Three Little Birds logo generations across client brands
Start Advisor Starter
Most cohorts
Advisor Pro
$299
/mo

Up to 25 clients — plus investor scenarios, what-if & campaigns.

Client seats
25
Your own plans
5
  • Everything in Advisor Starter, for 25 client seats
  • Investor scenarios, what-if planner & Email/SMS campaigns
  • Driver-based forecasting on every client plan
  • 25 Three Little Birds logo generations across client brands
Start Advisor Pro
Compare every tier
Feature
Basic
$15/mo
Standard
$25/mo
Advanced
$35/mo
Advisor
Advisor Starter
$149/mo
Advisor
Advisor Pro
$299/mo
Core — every tier
Business plans520Unlimited55
Three Little Birds-generated plan + launch board
Business Plan Examples — browse & clone 50 plans
SMART goals & weekly focus
Founder profile + Three Little Birds voice
Plan PDF exportWatermarkedCleanClean + Brand KitClean + Brand KitClean + Brand Kit
Launch OS — Standard & up
Budget, burn-rate & runway (+ receipt OCR)
Compliance & regulation tracker
Grants finder & application wizard
Plan Health Check
Founder Mentor
In-app Service Agents
Roadmap templates marketplaceBrowse-onlyApplyApplyApplyApply
Team collaborators (editor / viewer)
Industry benchmarks + snapshot PDF
Lender-ready financial package
Product & service feasibility analyzer (unit economics + Three Little Birds go/no-go)
Business optimization recommendations (cost / price / margin)
Continuous process improvement tracker
Native CRM + Document Library
QuickBooks & Xero sync
Customizable Pitch Deck (Investor/Banker presets)
Funding Strategy module
Scale — Advanced & Advisor Pro
Driver-based forecasting (3-yr monthly P&L, 36-mo CSV)
What-if scenario planner (layered, side-by-side)
Investor scenarios (equity / income / hybrid)
Email & SMS campaigns
Advisor & white-label — for agencies
Client seats included1025
White-label branding (your logo + colors)
Co-branded client login & invite pages
Cohort dashboard with per-client health scores
Email-invite onboarding (auto-copy link, 14-day expiry)
Full Standard features on every client seat
Three Little Birds logo generations (lifetime pool)221025
Coming from another tool?

Everything LivePlan does — plus an execution OS, for less.

We match the planning and forecasting tools founders switch for — then add the roadmap, CRM, campaigns, grants and Founder Mentor that take you all the way to launch.

Feature
Three Little Birds
You are here
LivePlan
Plan & financials — we match LivePlan
Three Little Birds business-plan writing
Example-plan library to clone & customize50 plans
Lender-ready 3-statement financials
Driver-based forecasting (3-yr monthly P&L, CSV)Premium only
What-if scenario plannerPremium only
Industry benchmarks with assumption flagsPremium only
Investor pitch deck builder
Plan-vs-actual + Three Little Birds Monthly ReviewPremium only
Editable .docx + email-to-banker export
An execution OS LivePlan doesn't have
Launch board + Gantt roadmap with critical path
Built-in CRM + deal pipeline → goals & runway
Loan modeler + bank-ready PDF package
Email & SMS campaigns
Grants finder + application wizard
Investor marketplace listing
Founder Mentor + real-time collaboration
Compliance tracker + launch-readiness score
Document vault + receipt OCR
Product & service feasibility analyzer (go / no-go)
Business optimization recommendations
Continuous process improvement tracker
Brand Kit — fully branded PDF & deck exports
White-label + advisor / referral tools
Pricing & access
Starting price$15/mo$20/mo
Full suite (top tier)$35/mo$40/mo
Free preview — no card requiredTrial only
One tool from idea to launch to growth
About Three Little Birds

The straight answers, in plain English.

What is Three Little Birds?
Three Little Birds is an all-in-one “business launch and operate OS” for first-time founders and small businesses. It pairs Three Little Birds business-plan writing and lender-grade financial modeling with a full execution layer — roadmap, CRM, campaigns, grants, compliance, and an Founder Mentor — so you go from idea to launch to growth in one tool.
Who is it for?
First-time founders, small-business owners, and the advisors and accelerators who serve them — anyone who wants a guided, structured path instead of a blank document.
How much does it cost?
Every new account gets a free 7-day full preview (no credit card). Paid plans are Basic $15/mo, Standard $25/mo, and Advanced $35/mo, with Advisor / white-label tiers for firms serving multiple clients.
What can I create with it?
A complete Three Little Birds-drafted business plan, lender-ready 3-statement financials with a driver-based 3-year monthly forecast and what-if scenarios, a drag-and-drop launch board (with a Gantt view for the critical path), a built-in CRM and deal pipeline, Three Little Birds-drafted ad copy for Meta / Google / TikTok / LinkedIn with server-side conversion tracking + CRM attribution, an investor pitch deck (PDF & PowerPoint), SBA-compliant lending documents, live-cited market research, and reporting dashboards.
How is it different from a template or plan-only tools like LivePlan?
Three Little Birds matches the plan-writing and forecasting of plan-only tools, then adds an execution OS they don’t have — roadmap, CRM, campaigns, grants, compliance, an investor marketplace, and an Founder Mentor — usually at a lower starting price.
Is Three Little Birds good for first-time founders?
Yes — it’s built for them. Instead of a blank document, you get a guided, step-by-step path: the drafts your plan, builds the financials, and lays out a launch roadmap, while a built-in Founder Mentor explains every step in plain English so non-financial founders can move with confidence.
Can I create an investor pitch deck and SBA loan documents?
Yes. You can generate an investor-ready pitch deck as both PDF and PowerPoint, plus SBA-compliant lending documents and a lender-ready 3-statement financial model — so you can approach investors and banks with a complete, professional package.
Is my plan private?
Yes. Your plan is private to your account, and you choose exactly what to share — for example, a read-only investor link or a lender document bundle.

More questions? Visit the Help & FAQ or start your free preview.

Stop noodling. Start shipping.

Seven-day preview tier on every new account, no card required. Generate your plan, see every section, decide later.

Reconnecting…